Decommissioning savings are earned during the Tender and early Engineering stages

26/05/2026

For offshore asset owners, operators and contractors, the highest cost and schedule drivers of a decommissioning campaign are determined by the removal and transport method, vessel spread and total duration of the offshore works.

A well-prepared engineering phase, supported by an early view on removal methodology, can make a significant difference on how to price the work, how risks and opportunities are allocated, and how efficiently offshore time is used.

With more than 40 years of engineering work in the North Sea, KCI has developed detailed knowledge of many of the platforms now reaching the end of life. That gives our Decommissioning team a high level of insight into these assets, and we bring this forward in several ways:

๐—ง๐—ฒ๐—ป๐—ฑ๐—ฒ๐—ฟ ๐—ฃ๐—ฟ๐—ฒ๐—ฝ๐—ฎ๐—ฟ๐—ฎ๐˜๐—ถ๐—ผ๐—ป / ๐—˜๐˜ƒ๐—ฎ๐—น๐˜‚๐—ฎ๐˜๐—ถ๐—ผ๐—ป โ€” Prepare a fit for purpose engineering tender, reflecting all aspects of the structural and removal engineering. KCI can also perform an independent engineering review of contractor proposals against the technical capabilities of the structure. This includes outline method statements framing how the structure can be most efficiently removed, helping operators receive comparable, well-scoped bids.

๐—ฃ๐—ฟ๐—ผ๐—ท๐—ฒ๐—ฐ๐˜ ๐—˜๐˜…๐—ฒ๐—ฐ๐˜‚๐˜๐—ถ๐—ผ๐—ป โ€“ Bring a dedicated team to the project with extensive knowledge about structural decommissioning engineering. This comes with many years of experience in the offshore decommissioning operations, connecting the real offshore works with the preparational engineering in the office.
Understanding the clientโ€™s needs, risks and requirements helped KCI in developing software tools for determining the most efficient and optimized way of working offshore, saving time, materials, and costs.

This way KCI will not be just a contractor, but your partner in the project.

The earlier the engineering conversation starts, the more flexibility there is to shape the outcome.

Read more about our Decommissioning product line: https://lnkd.in/eTNC9v-T

Planning a decommissioning campaign? Reach out at sales@kci.nl.