|
|
References
|
Kotter and Logger Oil platform Reassessment Two (2) oil producing platforms, both with a separate wellhead platform, have been re-assessed for life time extension.
IVB approval obtained in 2010.
|
 |
|
A12 Gas Platform Booster Compressor Re-assessment of the primary structure for IVB successful approval in 2010.
KCI designed the addition of - New 7 MW booster compressor and utility package - B13 platform tie-in deck In total 500T was added to the platform
|
 |
|
Horizon Platform Retrofit 800 tons of living quarter and utilities was added to a platform dating from 1989.
The complete design was executed by KCI and as part of that the structure was re-assessed for a life time extension.
Successful approval by IVB in 2008.
|
 |
P6A Gas Platform Life time extension analyses performed for the tie-in of two new satellites. |
 |
|
Q4C Platform Complete FEED and Detailed design and installation engineering and management of the Q4C platform.
Project included for all disciplines including Pipeline and Tie-in design. Weight indication: • Topside 2000 ton • LQ Module 500 ton • Jacket 1100 ton
During design phase the explosion analysis were conducted succesfully.
|
 |
Bohai Bay Phase II Development SYMS substructure FPSO mooring jacket design connecting to a soft yoke mooring system subject to wave, earthquake and FPSO mooring loads. Challenges where; - Functional analysis (using SACS software) - Foundation analysis (SACS) - Earthquake analysis (SLE spectral, DLE static pushover) - Fatigue Analysis (waves, high & low frequency mooring) - Vessel Impact Analysis (full plastic, using SACS) |
 |
|
Sakhalin II FPSO mooring tower Ice cone design for FPSO mooring tower subject to waves and ice plate loading.
Detailed FEM analysis has been conducted to assess the local stresses.
|
 |
|
Total Field Solution with KCI standard product;
MPP jackup type platform. • Complete platform design • Pipeline design incl. tie-in • Fabrication management • Installation engineering and management Track record • 3 platform originally installed • 2 platforms relocated without visiting port (by KCI)
This is a proven concept.
|
 |
|
M7 field development a Total Field Solution;
We have designed Complete monotower platform design. Discipline closely involved where process,
piping E&I + controls, structural, pipelines and procurement. This innovative tower design enables the operator to decommission the platform with a jackup type of methodology.
|
 |
|