BARD_Wind_farm_rotor_installation

Rotor Installation Engineering for BARD Wind Farm

In 2011 and 2012 KCI assisted the BARD project with the installation engineering.

The scope consisted of various parts:

In order to execute the scope succesfully the following analyses were performed:

Phase of Development
Installation Engineering

Year of Project
2011 - 2012

Location
Offshore

Client
BARD


#offshore  #installation-engineering  #renewables