Booster Compressor addition on A/12CPP

Booster Compressor addition on A/12CPP

Concept selection, FEED and detailed engineering for a booster compressor and associated utilities (cooling system a.o.) which was installed on the A/12 Central Processing Platform (CPP). The booster compressor allowed the platform to preserve production levels in the face of rapidly decreasing pressures of the seven tied-in gas wells (shallow reservoir), and also to boost the pressure of tied-in satellite platforms on the A and B blocks. KCI prepared not only the engineering and procurement packages, but also the initial cost estimates, project planning, HSE studies, installation design, expediting and construction support.

Phase of Development
Concept, FEED, detailed design, construction support

Year of Project
2008-2009

Location
OFFSHORE - SNS - Dutch Sector (A&B blocks)

Client
Chevron Exploration and Production Netherlands (currently Petrogas E&P)

Scope (multi-single)
Multi-discipline


#oil-and-gas  #concept  #FEED  #detailed-design  #construction-support  #offshore  #operation